Data is transferred from total stations on-site to a laptop or to the vendor cloud service.
All operations on the site must reference the designated local coordinate system and geodetic datum. Transformations are not needed at this stage.
You can use the Trimble Business Center (TBC) survey CAD software to convert various presentation formats of as-built points to LandXML or CSV supported by Infrakit.